4/6/2024 0 Comments Ponte 25 de abril lisboa![]() Visão's requests for clarification, such as whether the allocation of 20 million euros was put on hold by Finanças and when a decision had to be taken, remained unanswered (until the closure of the show Tuesday night) from the Centeno Ministry. Since then, the situation of the most used bridge in the country has deteriorated until the recent alert from the LNEC.Īn emergency budget to repair Ponte 25 de Abril The structural defects were detected three years ago but it is only today that the problem becomes public, also reveals Visão The magazine says that Infraestruturas of Portugal has requested an intervention for at least two years, because of serious cracks in the structure analyzed by the technicians. The Ministry of Mario Centeno did not respond to the request for funds. The Ministry of Planning and Infrastructure officially recognized the seriousness of the situation, writes the magazine and the document was sent by this ministry to the Ministry of Finance, which was asked to release the necessary funds to start the work. An alarming confidential report on cracks discovered 3 years agoĪ confidential document of the LNEC, warning of the extreme gravity of the state of the structure of the bridge, is revealed in the edition of Visão magazine on Thursday. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |